Desert Mountain Energy-TSX-V: DME
  • Home
  • About
    • Overview
    • Corporate Philosophy
    • Management Team
    • Corporate Information
    • Legal Notices / Privacy Policy
  • Helium
    • West Pecos
      • West Pecos Gas Field
      • Helium Processing Facility
      • Operating Processing Plant
      • Processing Plant Relocation
    • Holbrook
      • Holbrook Helium Project
      • Helium Drilling
      • Helium Processing Plant
    • About Helium
      • Importance of Helium
      • Video On Helium
      • More About Helium
  • Hydrogen
    • Hydrogen
    • Noble Gases
    • Noble Gas Projects
  • Investors
    • Stock Quote
    • Investor Presentation
    • May 31 2024–SGM Documents
    • Research Reports
    • Regulatory Filings
    • Investor Contact
  • News
    • DME News Releases
    • DME In the News
    • Media Contact
  • Contact
    • Contact Information
    • Investor Sign-up
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

DESERT MOUNTAIN ENERGY ENCOUNTERS GAS IN MULTIPLE ZONES AND SETS PRODUCTION CASING IN ITS FIRST EXPLORATORY WELL IN ARIZONA’S HOLBROOK BASIN

June 23, 2020

Vancouver, British Columbia — DESERT MOUNTAIN ENERGY CORP. (the “Company”) (TSX.V: DME, U.S. OTC: DMEHF, Frankfurt: QM01) is pleased to announce that it has encountered gas in multiple zones in its first wildcat exploratory well in Arizona’s Holbrook Basin.  DME Well No. State 10-1 (API No. 02-017-20130) encountered gas in five different zones aggregating approximately 182 ft. in width.  The well was spudded on June 17 and was drilled to a total depth of 2354 ft.  Production casing has now been set to the bottom of the hole and cemented.

Significant gas flows were encountered during both drilling and casing setting operations.  The helium content and composition of the gaseous mixture in the well remains unknown at this time, pending final well completion operations.  Complete laboratory gas analysis for helium and other gases will be undertaken at that time, together with studies of estimated flow production levels.

According to Robert Rohlfing, Executive V.P of Exploration and Head of Technical Operations for the Company, “It is very encouraging to have encountered a high level of controlled gas flows during our drilling and casing setting operations. However, the presence and amount of helium in the gaseous mixture has not yet been determined.  Going forward, our team will be reviewing all of the geophysical data from this well and making strategic recommendations based on that data.”

The Company plans to move the current drill rig directly onto its second exploratory well prospect, DME Well No. State 16-1 (API No. 02-017-20131) with a proposed total depth of 2790 ft., also situated in the Holbrook Basin in Central Navajo County.   It is anticipated that drilling will commence on that second well shortly after the 4th of July holiday. Well completion and testing procedures will then be undertaken on both of the two initial wells as soon as practicable, subject to availability of the completion rig.

About Desert Mountain Energy
The Company is an exploratory resource company engaged in exploration and development of helium, oil & gas and mineral properties in the Southwestern United States. Until September 5, 2018, the Company also owned the Yellowjacket Gold Project in Atlin, British Columbia, which it had been developing. The Company has its executive offices in Vancouver, Canada. The Company was incorporated under the laws of the Province of British Columbia, on April 30, 2008, and was formerly named African Queen Mines Ltd. It initially received certain southern African assets in a spin off transaction related to the acquisition of Pan African Mining Corp. by Asia Thai Mining Co., Ltd.

On Behalf of the Board of Directors of Desert Mountain Energy Corp.
“Irwin Olian”
Irwin Olian
Chairman & CEO

For more information, contact:
Irwin Olian
President and CEO
E-mail: tigertail@desertmountainenergy.com
Tel:  +1-604-788-0300

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the content of the information contained herein. The statements made in this press release may contain certain forward-looking statements that involve a number of risks and uncertainties. Actual events or results may differ from the Company’s expectations.

Share this entry
  • Share on Facebook
  • Share on X
  • Share on LinkedIn
https://www.desertmountainenergy.com/wp-content/uploads/2018/12/drilling-tower_desert-mountain-energy-heliopolis-helium-project-kight-gilcrease-sand-unit-oil-gas-high-grade-high-tech-rare-gas.jpg 1280 1920 Lee Dunston https://desertmountainenergy.com/wp-content/uploads/2019/01/Desert-Mountain-web-logo-4.png Lee Dunston2020-06-23 00:01:042020-06-22 20:15:49DESERT MOUNTAIN ENERGY ENCOUNTERS GAS IN MULTIPLE ZONES AND SETS PRODUCTION CASING IN ITS FIRST EXPLORATORY WELL IN ARIZONA’S HOLBROOK BASIN
Search Search
  • DESERT MOUNTAIN ENERGY RECEIVES LETTER OF SUPPORT FROM ROSWELL-CHAVES COUNTY ECONOMIC DEVELOPMENT CORPORATIONJuly 6, 2026 - 11:29 am
  • DESERT MOUNTAIN ENERGY SIGNS LONG-TERM LEASE AGREEMENT WITH ROSWELL INFORMATION PARK DEVELOPERMay 29, 2026 - 6:15 am
  • DESERT MOUNTAIN ENERGY ANNOUNCES ADEQ DETERMINATION FOR McCAULEY HELIUM FIELDMay 20, 2026 - 11:52 am
  • DESERT MOUNTAIN ENERGY PROVIDES UPDATE ON FLAGSTAFF LITIGATIONMay 14, 2026 - 7:36 am
  • DESERT MOUNTAIN ENERGY PROVIDES GENERAL UPDATEMay 5, 2026 - 6:12 am
  • DESERT MOUNTAIN ENERGY CLOSES $3,000,000 OFFERINGApril 9, 2026 - 8:05 am
  • DESERT MOUNTAIN ENERGY ANNOUNCES LIFE OFFERING TO RAISE UP TO $3,000,000March 30, 2026 - 5:31 am
  • DESERT MOUNTAIN ENERGY UNLOCKS NEW ECONOMIC FRONTIER WITH FORMATION OF HELIOS DATA COMPANY, LLCFebruary 24, 2026 - 10:51 am

SITE MAP

  • •  Home
  • •  About
  • •  West Pecos
  • •  Holbrook
  • •  About Helium
  • •  Hydrogen
  • •  Investors
  • •  News
  • •  Contact

DESERT MOUNTAIN
ENERGY CORP.
2500 Park Place
666 Burrard Street
Vancouver, BC V6C 2X8
Canada

USA OFFICE
17030 W. Saguaro Park Lane
Surprise, AZ 85387
USA

INVESTOR CONTACT
Don Mosher
President & Director
Tel: +1-604-617-5448
Email: don@desertmountainenergy.com

 

 

Branding and Design:
NextPhase Strategy Marketing Inc.

© Copyright - Desert Mountain Energy-TSX-V: DME - Enfold WordPress Theme by Kriesi
Link to: Desert Mountain Energy Drilling for Helium Underway in the Holbrook Basin (Pictures) Link to: Desert Mountain Energy Drilling for Helium Underway in the Holbrook Basin (Pictures) Desert Mountain Energy Drilling for Helium Underway in the Holbrook Basin (... Link to: DESERT MOUNTAIN ENERGY CONFIRMS PUBLIC DISCLOSURES COMPLETE Link to: DESERT MOUNTAIN ENERGY CONFIRMS PUBLIC DISCLOSURES COMPLETE DESERT MOUNTAIN ENERGY CONFIRMS PUBLIC DISCLOSURES COMPLETE
Scroll to top Scroll to top Scroll to top